Energy-efficient office building
Project Overview

Stages of construction of the building using the technology TAABS – a house with built-in office facilities, Kiev region, 1500 m2, 3 floors, 2011

Monthly power consumption:

  • for heating 4.5 kV * hour per 1 m2;
  • for cooling of the building to 1.5 kV*hour per 1 m2.
Heat insulation of the monolithic building foundation
Heat insulation of the monolithic building foundation
Heat insulation of the monolithic building foundation
Heat insulation of the monolithic building foundation
Heating pipes are mounted in the floor slab
Heating pipes are mounted in the floor slab
Monolithic frame provides greater reliability and open layout of the premises
Monolithic frame provides greater reliability and open layout of the premises

Monthly power consumption  for heating of the building  4.5 kV * hour per 1 m2
Monthly power consumption for heating of the building 4.5 kV * hour per 1 m2
Monthly power consumption for cooling of the building 1.5 kV*hour per 1 m2.
Monthly power consumption for cooling of the building 1.5 kV*hour per 1 m2.