Project Overview
Stages of construction of the building using the technology TAABS – a house with built-in office facilities, Kiev region, 1500 m2, 3 floors, 2011
Monthly power consumption:
- for heating 4.5 kV * hour per 1 m2;
- for cooling of the building to 1.5 kV*hour per 1 m2.
![Heat insulation of the monolithic building foundation](http://i0.wp.com/taabs.org/wp-content/uploads/2013/12/1.jpg)
![Heat insulation of the monolithic building foundation](http://i1.wp.com/taabs.org/wp-content/uploads/2013/12/2.jpg)
![Heating pipes are mounted in the floor slab](http://i0.wp.com/taabs.org/wp-content/uploads/2013/12/3.jpg)
![Monolithic frame provides greater reliability and open layout of the premises](http://i0.wp.com/taabs.org/wp-content/uploads/2013/12/5.jpg)
![Monthly power consumption for heating of the building 4.5 kV * hour per 1 m2](http://i2.wp.com/taabs.org/wp-content/uploads/2013/12/DSCF2597.jpg)
![Monthly power consumption for cooling of the building 1.5 kV*hour per 1 m2.](http://i0.wp.com/taabs.org/wp-content/uploads/2013/12/DSCF2595.jpg)